The following example table lists the different phases of upgrading your Test and Production environments, and promote jobs and folders between the Test and Production environments during the upgrade from 9.0.18.200 to 9.0.19.XXX. Promotions are available between the environment during all phases.
NOTE:
Phase |
Procedure |
---|---|
1 |
Upgrade the Control-M/EM server Test environment to 9.0.19.XXX. After the upgrade Compatibility Mode is set to On by default, and the compatibility version is 9.0.18.200. |
2 |
Upgrade the Control-M/Server Test environment to 9.0.19.XXX. |
3 |
Upgrade the Control-M/EM server Production environment to 9.0.19.XXX. After the upgrade Compatibility Mode is set to On by default, and the compatibility version is 9.0.18.200. |
4 |
Upgrade the Control-M/Server Production environment to 9.0.19.XXX. |
5 |
Turn Compatibility Mode Off for the Control-M/EM server Test and Production environments. |